Gl Events Headquarters | The Plan
  1. Home
  2. Magazine 2014
  3. The Plan 076
  4. Gl Events Headquarters

Gl Events Headquarters

Studio Odile Decq

Gl Events Headquarters
By Caterina Testa -
Poltrona Frau has participated in the project

Located at the confluence of the rivers Rhône and Saône on an isthmus oriented towards the hills of the city, the old industrial port of Lyon was finally closed in 1995. In 2005 the project “La Confluence” got underway to turn around this now derelict area and replace the former warehouses and deposits with a new urban district of offices, housing, retail, leisure facilities and public spaces in a quarter once out of bounds to Lyon’s citizens.
Although the industries and port no longer exist, the materials and colours of the new buildings that have sprung up in their place make a point of referencing the harsh, gritty atmosphere that once reigned here. The new headquarters of venue-and-event management company GL Events, designed by Odile Decq, takes as its cue from the heavy metal structures and gantry cranes that dotted the quays. The whole building speaks of the world that once inhabited this place.
Two enormous cross braces supported by three exposed steel pylons form a structural frame able to bear a four-storey volume cantilevered over a parallelepiped entrance, and sustain full-height inner and outer glazed façades. The ground and mezzanine floors are occupied by functions catering for the general public and are directly accessible from the quayside along the river. The overhanging parallelepiped office block is skewed 86° with respect to its plinth.  A major client requirement even at the competition stage was visual continuity between interiors and exteriors, the public and private sections of the building and throughout the offices. Visual permeability between inside and out has been achieved with full height glazing and by making a large aperture in the underside of the cantilevered volume to give views into the upper storey offices from the quay. Inside the building there are no blind partition walls, except for the lift and services block running up the building, with the result that there is...

Proceed with your preferred purchase option to continue reading
Digital

Digital

5.49 €
Printed

Printed

15.00 €
Subscription

Subscription

From 42.00 €
Choose subscription
Keep up with the latest trends in the architecture and design world

© Maggioli SpA • THE PLAN • Via del Pratello 8 • 40122 Bologna, Italy • T +39 051 227634 • P. IVA 02066400405 • ISSN 2499-6602 • E-ISSN 2385-2054